welcome,guest
Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-12-12 17:07
153
Company Profile
By certification [File Integrity]
Contact: tengtian(Ms.)
Email:
Telephone:
Area: Beijing
address: 23 Changqing Rd., Wulian, Rizhao, Shandong, China (262300)
Website: http://tengtian.masxlyjjx.com/
| Part I | Application | Cargo&passengers Transport |
| Technical Design | Design Max Speed | ≥60 km/h |
| Loading Capacity | 300-500 kg | |
| Unladen Kerb Weight | 300 kg | |
| Dimension(L*W*H) | 3155x1250x1430 mm | |
| Cargo size(L*W) | 1600*1250mm | |
| Color | Red/Green/Yellow/Black/Other colors | |
| Track | 1050 mm | |
| Wheel Base | 2100 mm | |
| Ground Clearance | 160 mm | |
| Brake Mode | Front&Back wheels, Drum | |
| Transmission Type | Shaft Drive | |
| Power | 8.0 kw | |
| Cool Type | Air Cooled | |
| Min.Fuel Consumption | <=354g kw.h | |
| Fuel Type | Gasoline | |
| Fuel Tank Capacity | 12 L | |
| Part II | Engine Type | Single cylinder,4-stroke,camshaft downward, Lifan Brand |
| Engine Details | Bore Stroke | 62×49.5mm |
| Fuel Type | Gasoline | |
| Compression Ratio | 9.5:1 | |
| Rated Power&Rotating Speed | 8.0 kw /8000rpm | |
| Max.Torgue/Rotating Speed | 10.5 N.m /5500rpm | |
| Lowest No-Load Speed Stability | 1500±150rpm | |
| Displacement(cc) | 150cc | |
| Ignition System | C.D.I. | |
| Apply to | Motor tricycle | |
| Starter | Kick/Electric | |
| Part III | Starting System | Electric/Kick |
| Operation | Transmission Mode | Shaft drive |
| Transmission | 5 Forward &1 Reserse Gears | |
| Front suspension | Front shock absorber | |
| Rear axle | Normal car rear axle | |
| Rear suspension | Leaf spring | |
| Gearshift Control | Manual-Foot | |
| Clutch Method | Manual-Hand | |
| Brake Operate Mode | Manual-Hand or Foot | |
| Part IV | Transport | By Land/Sea/Other |
| Packaging | Port Of Loading | Chongqing/Shanghai/Other ports of china |
| Original Manufacturer | Chongqing Tengtian Group | |
| Package | Protective Packaging | |
| Loading Capacity (SKD) | 24 units in 20"GP, 60Units in 40"HQ | |
| Delivery Time (from loading port) | 20-25 Days after receiving advance payment |