Hand Tool & Accessory
Steel Plant Finished Steel Warehouse Crane
2025-05-27 23:13  Visit:0
Price:Unfilled
Send inquiry
The crane of heavy plate factory adopts double trolley, double main hoist structure or single trolley double main hoist structure. The crane of each main operation line is selected by single trolley mechanism, and the double crane structure is adopted for the crane of finished product storehouse. The mechanical part of the two winches on the trolley is directly connected with a long axis, so as to realize the mechanical synchronization of the two winches.
link:http://www.chinacranemanufacturer.com/steel-mill-crane/steel-mill-overhead-crane/steel-plant-finished-steel-warehouse-crane.html
Message

TO: cf05c674

E-mail:

Content:

Contact information
Comment
0